(Free of Charge)
Time: 1:00 to 4:00 PM on December 13, 2023
Time | Activity |
1:00 – 1:30 | Meet at the first floor of CEO Tower, Pham Hung Street, Hanoi |
1:30 – 2:00 | Depart for Metro Line 3 construction site ( Station S9) |
2:00 – 3:30 | Visit Metro Line 3 construction site – Kim Ma Station (S9): |
3:30-4:00 | Go back to CEO Tower to end the tour |

Cutterhead of the TBM before being lowered down at Kim Ma Station (S9), Metro line 3 construction site, Hanoi